The post and beam walls for the coffee house are now framed. The next step will be the roof construction. Roof trusses have been ordered from a local lumber company and are scheduled to be delivered during the week of September 16.
The project is already attracting interest. A presentation about the rubble trench foundations has been made to engineering students at a local college. The students hope to schedule a visit to the site in the near future.